Back to list
SpaceX CEO Elon Musk: Ordered Solar Equipment with Annual Capacity of 100 GW
2026-11-11 07:51
As reported by TechFlow on November 11, SpaceX CEO Elon Musk disclosed that SpaceX has ordered heterojunction (HJT) solar cell manufacturing equipment with an annual capacity of 100 GW from Germany's Singulus for the Starmind project.
Singulus announced that the two parties have signed a supply contract for one turnkey heterojunction (HJT) solar cell production line, with plans to deliver multiple additional production lines. The first line is expected to be delivered in the first half of 2027, and capacity will expand gradually to support over 100 GW of production equipment. SpaceX is accelerating the manufacture of Starmind satellites in Bastrop, Texas.
Source: TechFlow
English
English
中文
繁体
日本
한국인
русский